At the forefront of Hydro Engineering in Sri Lanka and Singapore

  • Email Address
    tulsi@hypowerengineeringinternational.com

Projects

Contact Us

Contact us to see how we can help your project.

CONTACT US

Kaluganga Phase 1 2006 - JICA China GEO Engineering - China, Purac AB-Sweden

Kaluganga
  • Intake site & river bank investigation works
  • WTP site investigation works
  • Transmission Line Investigations (Bridge crossings)
  • Topographical and Longitudinal survey (Distribution)
  • Population & demand survey (Distribution)
  • Detail Designs
  • Intake site Designs
  • Quarters & site
  • Ground Reservoir, Pump House, Tower, Chlorine House, Transformer, Generator, pile designs, & site
  • E & M works on high lift pump house at WTP site
  • Preparation of drawings, reports, maintaining office, stationary and other activities

Moratuwa/Ratmalana, Ja-ela/Ekala 2009 SIDA- Phil-Denmark, Purac AB-Sweden

Moratuwa
  • Intake site & river bank investigation works
  • WTP site investigation works
  • Transmission Line Investigations (Bridge crossings)
  • Topographical and Longitudinal survey (Distribution)
  • Population & demand survey (Distribution)
  • Detail Designs
  • Intake site Designs
  • Quarters & site
  • Ground Reservoir, Pump House, Tower, Chlorine House, Transformer, Generator, pile designs, & site
  • E & M works on high lift pump house at WTP site
  • Preparation of drawings, reports, maintaining office, stationary and other activities

The project is to design and construct a sewer system for collection of the industrial and domestic waste-waters, including sewer pipes and pumping stations, a biological waste water treatment plants, and sea outfalls into ocean. The project area covers Ratmalana- Moratuwa in South of Colombo and Jaela-Ekala in the North of Colombo. EML provides technical expertise in engineering and also is responsible for environmental and social safeguards.

Nuwara Eliya Water supply 2009 Danida- Pihl- Denmark/Purac-Sweden

Danida
  • Intake site & river bank investigation works
  • WTP site investigation works
  • Transmission Line Investigations ( Bridge crossings)
  • Topographical and Longitudinal survey (Distribution)
  • Population & demand survey (Distribution)
  • Detail Designs
  • Intake site Designs
  • Quarters & site
  • Ground Reservoir, Pump House, Tower, Chlorine House, Transformer, Generator, pile designs, & site
  • E & M works on high lift pump house at WTP site
  • Preparation of drawings, reports, maintaining office, stationary and other activities

Ports Hambantota 2010 Chinese funding- Pharos Marine-UK

Hambantota
  • Consultancy Advisory role.
  • Installation & Site assistance.

Hypower Engineering International - Leading in Water and Wastewater